Image112.jpg

Above is a Mantair Treatment Plant, this is a 10PE
system, behind is a 8ton excavator.
(just to give you the size of the tank)

DSCF0195.JPG

DSCF0197.JPG

Above you wil see the different chambers, from left to right
the discharge chamber, the tank chamber, the GRP chamber and the emptying chamber
To the right, you will see the discharge chamber, the black pipe is a 20mm discharge pipe,which can be located 360 degrees from the tank, so the position of the tank to where the discharge can be in any direction, plus we can alter the discharge height

WES CONSTRUCTION (UK) LIMITED

sewage systems

Home | About Us | photos of completed work | sewage systems | Recommended Links | letter from our customers | Contact Us | take a look at the other services we carry out

Image108.jpg

Above is a brick built septic tank in its process
 of being taken out, which is not as easy as it looks

DSCF0181.JPG

Above is the new Mantair Treatment
Plant in the concreting stages

DSCF0215.JPG

Above we are bricking the area to which we will place the chamber covers, you will see the green GRP box, which houses the Air unit.

DSCF0189.JPG

DSCF0226.JPG

Above is the finished area after we have installed a new Mantair Treatment Plant

IMAG0045.JPG

Above, a new soakaway being
installed for a new treatment plant.
all soakaways are completed to Building
Control Standards & are checked.
in most cases we also apply for a
consent to discharge from the
Environmental Agency

 We are very happy to quote for work to be done from new builds to building Maintenance contracts. If you have any drawings and wish us to price for the work, please feel free to send these to our head office where we will be only to happy to take a look.
All our work in guaranteed and is inspected by the local Building Control.
We don't cut corners to cut costs
Call 07879 847392 or 01638 743708